Delivery of a set of boiler equipment. Three water-heating gas boilers with a capacity of 5.2 MW each have been installed.
Delivery of a set of boiler equipment. Three water-heating gas boilers with a capacity of 3.5 MW each have been installed.
Supply of equipment, construction of a boiler house and turnkey fuel transport system. A solid-fuel boiler is installed, the type of fuel is wood chips, bark, other woodworking waste, for obtaining superheated water, the power is 2.5 MW.
Scope of work – supply of equipment, construction of a steam boiler room and a “turnkey” heating station. Two steam gas boilers were installed, each with a capacity of 12 t/h.